Working notes on sizing, acceptance, deployment and device lifecycle. Calculations, checklists and decisions you can bring to a project.
Size the workload. Then choose the GPU.
A 70B memory calculation, the difference between GB300 and HGX B300, and the measurements needed for a useful comparison.
Accept a cluster with evidence.
The inventory, software baseline, communication tests and workload results that belong in the handover record.
Specify the Surface fleet, SKU by SKU.
Choose the processor architecture, match accessories and set the acceptance criteria before ordering a fleet.
Plan the data path across regions.
Site, platform, data location, support access and exit: the five parts of a regional deployment record.
Engineer the complete edge pipeline.
Eight camera streams, a storage calculation and the local operating decisions behind an edge deployment.
Commission Vera Rubin, gate by gate.
The facility, integration, workload and operating records required before a construction project becomes a compute service.
Refurbish Surface with a device-level record.
Serial identity, sanitization, management release, functional tests and battery measurements—from intake to dispatch.