IT ASSETS / COLOCATION / COMPUTE

COMPUTE.FOR OUR WORLD.

We put technology to work: enterprise IT assets, customer equipment colocation and dedicated GPU compute through partner data centers. Built for the people moving our world forward.

01 / Services

FROM THE RACK.
TO THE WORK.

From facility design to daily operation, we connect the physical system to the work it needs to do. Each engagement has a defined scope, an acceptance plan and a documented handover.

Scope of work

Colocation & infrastructure

We provide colocation for customer-owned IT equipment through partner data centers. ILION coordinates equipment intake, installation and the operating handover with the customer and facility team.

The deployment schedule records equipment dimensions and weight, rack units, power circuits, cooling requirements, uplinks, access permissions and the remote-hands scope. The service agreement assigns facility operations, hardware support, network management and customer workload responsibilities.

  • Intake: equipment list, serial numbers, rack units, dimensions and weight
  • Installation: power circuits, cooling, network ports and labeled connections
  • Operation: authorized access, remote hands, maintenance and escalation
02 / PARTNER DATA-CENTER OPERATIONS

ONE AMBITION.
THREE REGIONS.

Customer equipment and GPU deployments, supported through our partner data-center operations. Explore each region’s active platforms and construction programs.

Regional overview · locations are generalized
01 / PARTNER DATA-CENTER OPERATIONS

North Western Canada

Our partner data-center operations in Vancouver and Calgary support GB300 clusters and customer equipment colocation. The Vera Rubin cluster program in Western Canada is under construction.

Operational

Vancouver & Calgary

NVIDIA GB300

Under construction

Western Canada

NVIDIA Vera Rubin

Explore the facilities
03 / Systems

KEEP GOOD
HARDWARE WORKING.

Surface refurbishment with a device-level record: identity, sanitization, diagnostics, battery health and the configuration delivered.

Compare the model, configuration, condition and manufacturer servicing period before specifying a fleet.

Open the product explorer
04 / Field notes

KNOW THE DETAILS.
BUILD WITH INTENT.

All field notes
01
GPU SELECTION / 2 min read

Size the workload. Then choose the GPU.

A 70B memory calculation, the difference between GB300 and HGX B300, and the measurements needed for a useful comparison.

02
DEPLOYMENT / ACCEPTANCE / 2 min read

Accept a cluster with evidence.

The inventory, software baseline, communication tests and workload results that belong in the handover record.

03
MICROSOFT SURFACE / 3 min read

Specify the Surface fleet, SKU by SKU.

Choose the processor architecture, match accessories and set the acceptance criteria before ordering a fleet.

ILION / OUR PURPOSE

MORE PEOPLE.
MORE POSSIBILITY.

We believe the value of technology is measured by what people can do with it. Our part is practical: build reliable foundations for research, learning and enterprise, and keep capable hardware in use for longer.

CompanyMEDITERRANEAN FROM ORBIT / NASA · ISS EXPEDITION 62